worik Posted February 14, 2023 Author Posted February 14, 2023 SS2 recreation plot for book reading under construction 1
worik Posted February 25, 2023 Author Posted February 25, 2023 Companion's bedroom and office with a potted plant and my own bedroom a bit uplifted 1
worik Posted March 8, 2023 Author Posted March 8, 2023 My companions's bedroom. Mainly Piper and Ellen as both of them are assigned to Greygarden The maingate to the south and the sensors to control the door. First is the siren up left, next to it a manual override switch Above the gate are proximity sensors, one triggered for allies to open the gate and the last one to close the gate, when enemies are nearby. 1
worik Posted June 8, 2023 Author Posted June 8, 2023 Late night office duty at the southern gate. The gate is behind the chair, down below the window 1
worik Posted June 27, 2023 Author Posted June 27, 2023 More from Graygarden: The view over to an earlier stage of my western building. (Later, I have constructed a connection to the main building in the 2nd and 3rd floor. Picture will follow later) During the construction phase, the foundations at the foot of the highway pylons. Constrcution phase of the industrial area at the eastern wall. Fortified corner building in the NE corner Some water pumps at the foot, turret on top and a guard post 1
Recommended Posts